Atualizado em 

In case of sending a document with the wrong completed revision, it is possible to remove the last revision of the document.

It is required of the user to have permission to remove configured in the folder.

  1. Go to Dashboard.
  2. Click on Docs – Documents.

3. Click on the “Documents” folder and select the desired document.

4. Click on the “Details” icon .

You must have at least one completed revision or submission approved through the approval flow.

Click ” Options“> “Remove last revision“.

After confirming, the last revision of the document will be removed.