Links – Wiki https://wiki.qualiex.com Base de Conhecimento Sobre o Software da Qualidade Qualiex Mon, 27 Sep 2021 19:38:39 +0000 pt-BR hourly 1 https://wordpress.org/?v=6.5.2 https://wiki.qualiex.com/wp-content/uploads/2021/10/cropped-favicon-32x32-1-32x32.png Links – Wiki https://wiki.qualiex.com 32 32 How to link a document to the flow? https://wiki.qualiex.com/modules/flow-en/how-to-link-a-document-to-the-flow/ Mon, 27 Sep 2021 19:38:39 +0000 https://wiki.qualiex.com/?post_type=docs&p=2488

Atualizado em 

In Flows we can link a Docs document to the flow.
We can link a document to a flow in any status, click on the context menu  and select the option Link Documents.

Only the issuer or person responsible for the flow can link documents.

Accessing the flow it is also possible to link documents, on the details screen click .

The screen for linking a document appears.
Locate the document that will be linked.

After locating the document click:

  • Open: To view the document.
  • Link: Associate the document with the flow.

Linked documents are displayed on the Linked tab.

If you need to remove the link from a document, go to the Linked tab.
In the document’s context menu, click Remove.

Loading

]]>
How to link an indicator to the flow? https://wiki.qualiex.com/modules/flow-en/how-to-link-an-indicator-to-the-flow/ Mon, 27 Sep 2021 19:37:31 +0000 https://wiki.qualiex.com/?post_type=docs&p=2486

Atualizado em 

In Flows, we can link an Indicator indicator to the flow.
We can link an indicator to a flow in any status, click on the context menu  and select the option Link indicators.

Only the issuer or person responsible for the flow can link indicators.

Accessing the flow it is also possible to link indicators, on the details screen click .

The screen for linking a document appears.
Locate the document that will be linked.

After locating the indicator click on:

  • Open: To view the indicator.
  • Link: Associate the indicator with the flow.

Linked indicators are displayed on the Linked tab.

If it is necessary to remove the link from an indicator, go to the Linked tab.
In the context menu of the indicator and click Remove.

Loading

]]>
How to link a risk to the flow? https://wiki.qualiex.com/modules/flow-en/how-to-link-a-risk-to-the-flow/ Mon, 27 Sep 2021 19:36:31 +0000 https://wiki.qualiex.com/?post_type=docs&p=2484

Atualizado em 

In Flows we can link a risk from Risks to the flow.
We can link a risk to a flow in any status, click on the context menu  and select the option Link Risks.

Only the issuer or person responsible for the flow can link risks.

Accessing the flow, it is also possible to link risks, on the details screen click .

The screen for linking a risk will appear.
Locate the risk that will be linked.

After locating the risk, click on:

  • Open: To view the risk.
  • Link: Associate the risk with the flow.

Linked risks are displayed on the Linked tab.

If it is necessary to remove the link from a risk, go to the Linked tab.
In the risk context menu, click Remove.

Loading

]]>
How to link another flow to a subprocess https://wiki.qualiex.com/modules/flow-en/how-to-link-another-flow-to-a-subprocess/ Mon, 27 Sep 2021 19:35:42 +0000 https://wiki.qualiex.com/?post_type=docs&p=2482

Atualizado em 

When designing a flow, we can link another flow already created as a sub-process.

Here’s how to draw a stream.

Access the flow drawing mode and add the sub-process shape .

To access the drawing mode, it is necessary to be the sender or responsible for the flow.

When adding the shape, the configuration tab will be visible.

To link, select the desired flow from the list. Click on view sub-process to view the linked flow.

Flows with at least one approved and active review are displayed in the listing.

.

Loading

]]>